Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Solve Pit of Silence Light Mirror Puzzle in Upper Level – Dragon Quest 7 Reimagined

    February 4, 2026

    Solve Rainbow Mines Colored Rocks Puzzle – Dragon Quest 7 Reimagined

    February 4, 2026

    How to Recruit Dalar Knight in Of Ash and Steel

    February 4, 2026
    Facebook X (Twitter) Instagram
    Patch Crazy
    • Guides
    • Server Status
    • Patch Notes
    • Featured
    • News
    • Reviews
    Facebook X (Twitter) Instagram
    Patch Crazy
    Home»Guides»How to Fully Automate Dock Warehouse in Schedule 1
    How to Fully Automate Dock Warehouse in Schedule 1
    Guides

    How to Fully Automate Dock Warehouse in Schedule 1

    By SankarApril 7, 2025No Comments3 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The following details outline a highly efficient, semi-automated cocaine production setup within a “Schedule 1” context, focusing on maximizing output with minimal manual intervention in a dock warehouse and barn environment. This system, while not fully autonomous due to inherent limitations, aims for near hands-free operation across coca plant cultivation and cocaine processing stages, making it suitable for large-scale endeavors.

    How to Fully Automate Dock Warehouse

    This dock warehouse and barn setup is one of the most efficient semi-automated cocaine production builds currently achievable in Schedule 1. While some manual tasks remain, the majority of the system runs hands-free, making it ideal for large-scale operations.

    Phase 1: Coca Plant Production Setup

    Staffing Requirements

    • 8 Botanists
    • 1 Cleaner

    Warehouse Layout

    • Storage & Beds:
      • Overflow storage racks repurposed from a dismantled meth lab.
      • Four soil storage racks.
      • Eight drying racks for dried leaves, each paired with a dedicated output rack.
      • A total of 24 growing pots.
      • Sleeping quarters set up for all workers with a few spare beds included.

    Automation Steps

    1. Assign Botanists:
      • Each botanist is assigned to one soil supply rack.
      • Three pots are designated to each botanist to maintain efficient workload distribution.
    2. Growing & Drying Workflow:
      • Each group of three pots is linked to a specific drying rack.
      • Botanists are assigned to their corresponding drying racks, ensuring harvested cocoa leaves are automatically transferred for drying.
    3. Drying Rack Configuration:
      • All drying racks are set to “Quality: Gold”.
      • Dried leaves are then routed to the storage racks beside each drying unit.
    4. Cleaner Setup:
      • The cleaner is assigned to manage three strategically placed bins that cover the entire workspace, ensuring cleanliness and efficiency.
    How to Get and Use the Cauldron in Schedule 1 Game

    Phase 2: Cauldron Cooking in the Barn

    Required Equipment

    • 8 Cauldrons
    • 8 Labs
    • 22 Storage Racks (Including overflow and future-proofing for brick pressing)

    Staffing Requirements

    • 8 Chemists
    • 2 Handlers

    Each chemist is assigned to:

    • One cauldron
    • One lab station
    • One nearby bed

    This one-to-one assignment maximizes processing speed and minimizes walking distance.

    Handler Logistics

    • Two handlers are used to transport gasoline from four large storage racks to the cauldrons.
    • Each handler is assigned multiple routes to ensure all cauldrons receive the necessary fuel supply.

    Production Routing

    1. Cauldron to Lab:
      • Each cauldron is linked to the nearest lab station to streamline the transfer of processed cocoa paste.
    2. Lab to Storage:
      • Lab output is directed to designated storage racks.
      • Overflow racks are placed nearby for manual transfer when necessary.

    Limitations & Optimization Ideas

    • Worker Limit: With a cap of 10 workers in the barn, full automation is limited. To improve this:
      • Chemists could potentially be assigned to multiple stations to free up space for additional handlers.
      • Additional handlers could automate overflow transfers.
    • Manual Tasks:
      • Gasoline restocking is not automated but rarely needed due to the low consumption rate.
      • Overflow storage management and final mixing processes are still manual but may be optimized in future builds.
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Sankar
    • X (Twitter)
    • LinkedIn

    Decided that degrees were as useful as extra lives in a Mario game-totally unnecessary! I’m diving into the extravagant universe of my favourite game, Assassin’s Creed, which lets me roam the world without actually paying for plane tickets. Hodophile by nature and aspiring to get lost in Hang Sơn Đoòng cave in Vietnam someday!

    Related Posts

    Solve Pit of Silence Light Mirror Puzzle in Upper Level – Dragon Quest 7 Reimagined

    February 4, 2026

    Solve Rainbow Mines Colored Rocks Puzzle – Dragon Quest 7 Reimagined

    February 4, 2026

    How to Recruit Dalar Knight in Of Ash and Steel

    February 4, 2026

    All Tenryu River Collectibles (Kodama, Jizo, Chijiko, Scampuss) – Nioh 3

    February 4, 2026
    Add A Comment
    Leave A Reply Cancel Reply

    Editors Picks
    Guides

    Solve Pit of Silence Light Mirror Puzzle in Upper Level – Dragon Quest 7 Reimagined

    By Sankar
    Guides

    Solve Rainbow Mines Colored Rocks Puzzle – Dragon Quest 7 Reimagined

    By Sankar
    Guides

    How to Recruit Dalar Knight in Of Ash and Steel

    By Nandita
    Guides

    All Tenryu River Collectibles (Kodama, Jizo, Chijiko, Scampuss) – Nioh 3

    By Harry S
    Guides

    All Tokaido Collectables (Samurai’s Locks, Kodama, Hot Springs, Jizo, Scampuss, Secret Skills) – Nioh 3

    By Harry S
    Patch Crazy
    Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
    • Home
    © 2026 PatchCrazy.

    Type above and press Enter to search. Press Esc to cancel.